Annual Mekong Flood Report 2012
1. SYNOPSIS Following the significant flood conditions of 2011, the situation during 2012 proved to be quite the opposite. The flood peak and volume were between 30 and 40% below the long term...
1. SYNOPSIS Following the significant flood conditions of 2011, the situation during 2012 proved to be quite the opposite. The flood peak and volume were between 30 and 40% below the long term...
GLIDE n=B0 TC-2007-00178-VNM 16 January 2009 Period covered by this Final Report: 10 October 2007-10 October 2008; Appeal target (current): CHF 3,231,507 (USD 2.7 million or EUR 1.9 million)...
MANILA, PHILIPPINES - The Asian Development Bank (ADB) is providing a $25.5 million supplementary financing to an existing emergency assistance loan to Viet Nam for the rehabilitation of rural...
This report covers the period 1 January to 30 June 2008. In brief Programme purpose: The 2008-2009 support programme aims to strengthen the Vietnam Red Cross Society's role as the leading...
1. Introduction As in 2006, the 2007 Annual Flood Report aims to fill two primary roles, (i) to provide a summary of flood conditions in the Mekong Region over the year, and (ii) to collate the...
This year, three key developments have influenced WHO's emergency work: 1) the increasing demands from Member States to strengthen WHO's emergency response operations; 2) the implementation of the...
This report covers the period 1/7/2007 to 30/11/2007 of the 2006-07 appeal. In a world of global challenges, continued poverty, inequity, and increasing vulnerability to disasters and disease, the...
HANOI, Jan 2, 2008 (Xinhua via COMTEX) -- Natural disasters, mainly floods, hail, landslide and storms, claimed 435 lives and left 850 others missing or injured in Vietnam last year, Vietnam News...
This appeal seeks CHF 2,019,827 (USD 1.8 million or EUR 1.22 million) to fund the planned programmes to be implemented in 2008-2009. Click here for budget summary. This amount will be supplemented by...
This appeal seeks CHF 6,811,539 (USD 6.09 million or EUR 4.13 million) to fund the planned programmes that are to be implemented in 2008-2009. The overall budget is CHF 8,923,817 (USD 7.98 million or...